Parli Thermal Power Station Got to Stop Procedures of 2 Devices
Chhatrapati Sambhajinagar– The Central Pollution Control Panel (CPCB) has actually instructed Maharashtra state authorities to promptly stop operations of Systems 6 and 8 at the Parli Thermal Power Station (PTPS) in Beed district due to extreme environmental non-compliance.
Secret findings motivating the order:
- Too much Discharges: PM emissions from Systems 6 and 8 substantially gone beyond acceptable limitations (87 – 91 mg/Nm 3 versus a restriction of 50 mg/Nm 3
- Illegal Procedures: The systems proceeded running regardless of previous closure instructions from CPCB in May 2025, and ran out Grant Operate, provided in December 2024
- Ecological Risks: Without treatment sewer and ash straight dealt with in all-natural drains, and hazardous problems were found at the ash storage space website.
PTPS officials assert they have actually not yet obtained the letter yet will respond upon invoice.
